Layher Allround Modular Scaffolding
High load capacity scaffolding in circular, stepped and cantilevered geometries using the rosette-connected modular system.
- Adapts to non-standard geometry
- Fast erection and dismantling
- High load class options
From facade scaffolding to industrial maintenance platforms, from concert stages to festival towers — we engineer, erect and safely hand over temporary steel structures.
Base & yard in Menemen / İzmir · fast mobilisation across the Aegean, on-site service throughout Türkiye
We build temporary steel structures for disciplines ranging from construction to live events. Every job starts with an on-site survey and a technical review.
High load capacity scaffolding in circular, stepped and cantilevered geometries using the rosette-connected modular system.
Full-perimeter scaffolding for cladding, insulation, painting and restoration works on residential, office and public buildings.
Access platforms around boilers, silos, pipe racks and tanks during plant shutdowns in factories and power stations.
Main stages, stage roofs and load-bearing support structures erected with wind and rigging loads calculated in advance.
Entrance gates, scenery carriers and temporary structures across multi-stage festival sites, planned as a single layout.
Safe erection of speaker towers, screen support structures, camera platforms and front-of-house mixer towers.
Temporary spectator stands, VIP platforms, catwalks and protocol areas built from modular platform systems.
Bespoke structures where standard solutions fall short — inside pools, along shorelines and on sloping terrain.
In the Allround system, rosettes welded to the standards allow eight connections from one node. Whatever the geometry of the structure, the scaffolding adapts to the building — not the other way round.
Curved facades, cantilevers, bridge soffits and stepped levels are solved with standard components.
Load class, platform width and anchoring plan follow the capacity the job actually requires.
Few standard components mean fast erection — critical when the build-and-strike window is short.
Very different jobs are covered by different configurations of the same system. The mapping below clarifies what we are talking about in each case.
Quality comes down to the right system, the right calculation and the discipline of the crew that erects it. We provide all three.
For non-standard work we prepare drawings and structural calculations before erection and arrive on site with an approved design.
Personal protective equipment, lifelines and guardrails are not open to negotiation; they are how we work.
We build with our own crews. Because the chain of responsibility stays intact, schedule and quality remain predictable.
Material and crews are dispatched from our İzmir base; for out-of-town projects transport planning is part of the quotation.
In event work the rehearsal time is fixed. We plan the build backwards from that moment.
A shared material and crew capacity with our sister company lets us mobilise large-scale projects in a single move.
The same technical lead stays with you throughout: quotation, erection and handover are handled by one team.
We visit the site and assess ground conditions, access routes and the work schedule together with you.
System layout, load class and bill of materials are produced, and an itemised quotation is issued.
Trained crews complete the build on the agreed schedule, in line with occupational safety rules.
The structure is inspected, a conformity and handover record is issued, and the scaffolding is released for use.
We dismantle, load out and clean the site at the end of the job, leaving the area as we found it.
Location, type of work and approximate dimensions are enough to start. Let us schedule the site survey together.
In event and shutdown work the handover time is fixed — the earlier we start planning, the smoother it goes.